Spina Group manufactures and supplies instrumental cables for transmission of analog (4…20mA) and digital signals, interconnection of measuring and process instruments, in safety areas and in augmented and intrinsically safe environments. We also manufactur and supply thermocouple cables TX, JX, EX, KX type to be used in all conditions and in every industrial plant. Production takes place on the basis of specific contracts and the cables are carefully tested to ensure maximum performance.

Typologies

Accessories

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

North Safa Field Development Project

North Safa is an active conventional oil field situated in shallow waters off the coast of Egypt. Specifically located in the Northeast Ramadan Concession block, the field operates at a water depth of 217 feet. Anticipated to reach peak production by 2026, North Safa’s oil extraction will persist until it reaches its economic limit in 2041, as per economic projections.

Oil&Gas

Ghana OCTP Development Project

The Offshore Cape Three Points (OCTP) project is a comprehensive endeavor focused on developing oil and natural gas reserves, specifically to meet the energy needs of Sub-Saharan Africa. Positioned off Ghana’s western coast, OCTP operates subsea wells and systems linked to the John Agyekum Kufuor Floating Production Storage and Offloading (FPSO) unit. In 2020, OCTP contributed over half of Ghana’s gas supply for thermal power generation.

Oil&Gas

Garraf Field – Gas Dehydration Plant

Situated in the Thi Qar province, approximately 5km northwest of Al-Refaei city and 85km north of Nasiriya, the Garraf oil field has an onshore location. Discovered in 1984, this oil field contains oil reserves within Cretaceous reservoirs. Spanning 17.5km in length and 5.5km in width, it is estimated to harbor 1.3 billion barrels of oil. Upon reaching full production, the field’s production capacity is projected to escalate to 230,000 barrels of oil per day (bopd). Transportation of the oil field’s products is facilitated through a 13km pipeline to the Gharraf-Badra tie-in area (GBTA). Subsequently, it is conveyed via a 28-inch, 92km pipeline to the Nassiriyah storage depot.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs