Search

Instrument Cables and Thermocouples

Spina Group manufactures and supplies instrumental cables for transmission of analog (4…20mA) and digital signals, interconnection of measuring and process instruments, in safety areas and in augmented and intrinsically safe environments. We also manufactur and supply thermocouple cables TX, JX, EX, KX type to be used in all conditions and in every industrial plant. Production takes place on the basis of specific contracts and the cables are carefully tested to ensure maximum performance.

Typologies

Accessories

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Coral South Project

At the center of the project, Coral Sul FLNG: a floating plant for the liquefaction of natural gas. The ship is 432 meters long and weighs 200 thousand tons. It also has a gas liquefaction capacity of 3.4 million tons per year and will produce LNG from the 500 billion cubic meters of gas from the Coral field. This historic project will help increase the availability of gas on the global market and is an important lever of Mozambique economic and social development.

Energy

Porthos Compressor Station

The Porthos Project is developed in the Port of Rotterdam, in the Netherlands. The project involves the transport of CO₂ captured from port industries through a network of onshore and offshore pipelines to depleted gas fields located beneath the North Sea, where the CO₂ is permanently stored. Its objective is to reduce industrial emissions from the Rotterdam cluster and contribute to the decarbonization of high-emission sectors.

Oil&Gas

Tortue Development Project – Phase 1

An offshore project based on gas production in deep waters up to 2 km off the maritime border between Mauritania and Senegal. It is currently the deepest offshore project in Africa. Planned in phases, the Greater Tortue Ahmeyim LNG project will produce up to 10 million tonnes of LNG per year (Mtpa). A new drilling called Greater Tortue Ahmeyim-1 was carried out to a total depth of 4,884 meters in the eastern part of the Greater Tortue area, discovering 30 meters of net gas in a high-quality Albian reservoir in July 2019. This new discovery indicates the potential to expand the capacity of the LNG project beyond 10 Mtpa in the future.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs