Search

Distribution Control Panels

Atex electrical panels meet international quality standards.

All the products comply with international and CEI standards and are manufactured by an internal design studio according to customer requirements.

In addition to the design of the panels, Spina offers a complete service that includes wiring, testing, packaging and shipping plus the technical documentation about the product and its functioning.

Typologies

Accessories

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Abu Attifel and NC 125 Conventional Oil Field

Located onshore Libya, the Abu Attifel and NC 125 fields are active in conventional oil production. Their peak production occurred in 1994, having already recovered 92.14% of their total recoverable reserves. Economic projections indicate that oil extraction will continue until these fields reach their economic limit by 2046. Presently, these fields contribute approximately 5% to Libya’s daily oil output.

Oil&Gas

SAIPEM 7000

The Saipem 7000 is a semi-submersible crane and pipelaying vessel operating within the Saipem fleet. The unit is designed to support complex offshore projects through heavy-lift operations, offshore structure installation, subsea works and J-lay pipelaying activities. Equipped with an advanced dynamic positioning system, two main cranes with a lifting capacity of up to 14,000 t in tandem lift, and pipelaying capability in water depths exceeding 2,000 m, the Saipem 7000 is deployed on conventional, deepwater and ultra-deepwater offshore projects worldwide.

Oil&Gas

Rhourde El Baguel LPG Extraction Plant (REB LPG)

The Rhourde El Baguel LPG Extraction Plant is a facility designed to treat associated gas from oil production and recover LPG, condensate and dry gas. The project is linked to the Rhourde El Baguel production complex, one of Sonatrach’s Oil & Gas assets in Algeria. It has a planned processing capacity of approximately 10 million m³/day of associated gas. Expected output is estimated at around 1,000 t/day of LPG, 300 t/day of condensate and 8.7 million m³/day of dry gas.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs