Search

Distribution Control Panels

Atex electrical panels meet international quality standards.

All the products comply with international and CEI standards and are manufactured by an internal design studio according to customer requirements.

In addition to the design of the panels, Spina offers a complete service that includes wiring, testing, packaging and shipping plus the technical documentation about the product and its functioning.

Typologies

Accessories

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Abu Attifel and NC 125 Conventional Oil Field

Located onshore Libya, the Abu Attifel and NC 125 fields are active in conventional oil production. Their peak production occurred in 1994, having already recovered 92.14% of their total recoverable reserves. Economic projections indicate that oil extraction will continue until these fields reach their economic limit by 2046. Presently, these fields contribute approximately 5% to Libya’s daily oil output.

Oil&Gas

Rumaila Project — ESP OHTL Ringmains Phase 1 — Area C

The Rumaila Project – ESP OHTL Ringmains is an Oil & Gas project developed within the Rumaila Oil Field, in southern Iraq. The project is part of the wider ESP Ring Main Project, aimed at developing ring-main electrical infrastructure and overhead transmission lines to power wells equipped with Electrical Submersible Pumps. Its objective is to provide stable power from the Rumaila Power Plant to the ESP wells, reducing the use of diesel generators, improving operational reliability and supporting the field’s long-term oil production.

Petrochemical

Bouri Field

The Bouri Field is located offshore in Block NC-41, about 120km northwest of Tripoli in the waters of Libya. Water depth in the region ranges between 145m and 183m. Is estimated to contain 4.5 billion barrels (720,000,000 m3) in proven recoverable crude oil reserves and 3.5 trillion cubic feet (99 km3) of associated natural gas with an annual production potential of 6 billion m³. Bouri field development includes two offshore platforms- DP3 and DP4, seven subsea wells and an Floating Storage and Offloading (FSO). Bouri is considered the largest producing oilfield in the Mediterranean.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs