Search

Tubing

Spina Group offers various types of cable holders for explosion-proof electrical systems and UL type and flexible pipes necessary for the construction of suitable “electrical conduits” inside walls and floors so that the electrical cables are protected from impact, humidity and compressions.

Typologies

Accessories

Among our tubing, you will find:

  • Stainless Steel Seamless Tubing
  • Copper Seamless Tubing

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Petrochemical

Bouri Field

The Bouri Field is located offshore in Block NC-41, about 120km northwest of Tripoli in the waters of Libya. Water depth in the region ranges between 145m and 183m. Is estimated to contain 4.5 billion barrels (720,000,000 m3) in proven recoverable crude oil reserves and 3.5 trillion cubic feet (99 km3) of associated natural gas with an annual production potential of 6 billion m³. Bouri field development includes two offshore platforms- DP3 and DP4, seven subsea wells and an Floating Storage and Offloading (FSO). Bouri is considered the largest producing oilfield in the Mediterranean.

Oil&Gas

Petrobrazi Refinery

Petrobrazi, boasting an annual refining capacity of 4.5 million tons/year of crude oil, stands as one of Romania’s foremost refineries. It serves as a pivotal hub where crude oil undergoes processing, resulting in a diverse array of high-value petroleum products, ranging from gasoline and diesel to LPG and aviation fuel. Presently, Petrobrazi operates at exemplary environmental and performance standards, capable of refining the entire equity crude oil production of OMV Petrom. In a strategic move towards sustainability, the Romanian oil company plans to construct 55MW of green hydrogen projects at its Petrobrazi refinery, located 60km north of Bucharest. This initiative involves the installation of two electrolysers, one with a capacity of 35MW and the other with 20MW. The renewable hydrogen generated will be utilized in the production of bio-based sustainable aviation fuel (SAF) and biodiesel, marking a significant step towards reducing carbon emissions in the aviation sector.

Oil&Gas

Berri Oil Field Expansion

The Berri field, situated along the eastern coast of Saudi Arabia, is undergoing expansion through the Berri Increment Program (BIP) to increase its crude production capacity to 500,000 barrels per day (bpd). Initially discovered in 1964, the Berri field commenced crude oil production in 1970, with the Berri gas plant starting operations in 1977. Currently capable of producing 250,000 bpd of Arab Light crude, the field’s expansion program aims to double its crude production capacity through enhanced oil recovery techniques.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs