Search

Pots and Siphons

Spina Group offers a wide range of condensate separation barrels, air distribution and siphons, which are used for the treatment and distribution of the process fluid before it reaches the instrument.

The siphons are used on the steam measurement lines to prevent it from directly investing the instrument and also to guarantee good heat dissipation avoiding overheating of the pressure gauge.

Typologies

Accessories

  • Condensing and Seal Pot
  • Gauge Siphon

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Luanda Refinery

The expansion and modernization initiative aims to significantly increase the refinery’s petrol production capacity, quadrupling it to 450 thousand tonnes per year. As a part of this project, the Combined Cycle has been revamped to utilize hydrogen generated by the new Platforming unit. Additionally, energy production has been optimized by recycling gas, resulting in a notable reduction in polluting emissions.

Oil&Gas

Kaombo FPSO Project

An innovative ultra-deep-water offshore project, the Kaombo project in Block 32 aims to extract oil from six fields linked by 300km of pipelines to FPSO vessels. Operating at depths up to 1,950 meters, it utilizes advanced technology for its 658 million barrel reserves, with a production capacity of 230,000 b/d, making it Angola’s largest subsea well system. Through cutting-edge technology and engineering, it pushes the boundaries of traditional oil exploration, demonstrating Angola’s commitment to advancing its energy sector.

Oil&Gas

Hail & Ghasha Gas Development

Hail & Ghasha Gas Development is one of the world’s largest sour gas development projects. It includes the development of the offshore Hail, Ghasha, Dalma, Nasr, SARB, Bu Haseer, Shuweihat and Mubarraz fields, together with the construction of new offshore infrastructure and onshore gas processing facilities. The project is also designed to become the world’s first net-zero sour gas development. Package 2 (PKG-2) covers the construction of the onshore gas processing facilities. Its main scope includes sour gas processing plants, sulfur recovery and by-product handling units, compression systems, utilities and auxiliary infrastructure, as well as connections to the offshore installations and the UAE’s national gas network. The project aims to increase the United Arab Emirates’ natural gas production, support domestic energy self-sufficiency and boost exports, while reducing the carbon intensity of operations through the integration of Carbon Capture and Storage (CCS) technologies. Once completed, the development is expected to produce approximately 1.5–1.8 billion standard cubic feet of natural gas per day (bcf/d), in addition to condensate and sulfur, making a significant contribution to ADNOC’s long-term gas strategy.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs