Search

Pots and Siphons

Spina Group offers a wide range of condensate separation barrels, air distribution and siphons, which are used for the treatment and distribution of the process fluid before it reaches the instrument.

The siphons are used on the steam measurement lines to prevent it from directly investing the instrument and also to guarantee good heat dissipation avoiding overheating of the pressure gauge.

Typologies

Accessories

  • Condensing and Seal Pot
  • Gauge Siphon

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Abu Attifel and NC 125 Conventional Oil Field

Located onshore Libya, the Abu Attifel and NC 125 fields are active in conventional oil production. Their peak production occurred in 1994, having already recovered 92.14% of their total recoverable reserves. Economic projections indicate that oil extraction will continue until these fields reach their economic limit by 2046. Presently, these fields contribute approximately 5% to Libya’s daily oil output.

Oil&Gas

Tortue Development Project – Phase 1

An offshore project based on gas production in deep waters up to 2 km off the maritime border between Mauritania and Senegal. It is currently the deepest offshore project in Africa. Planned in phases, the Greater Tortue Ahmeyim LNG project will produce up to 10 million tonnes of LNG per year (Mtpa). A new drilling called Greater Tortue Ahmeyim-1 was carried out to a total depth of 4,884 meters in the eastern part of the Greater Tortue area, discovering 30 meters of net gas in a high-quality Albian reservoir in July 2019. This new discovery indicates the potential to expand the capacity of the LNG project beyond 10 Mtpa in the future.

Oil&Gas

Berri Oil Field Expansion

The Berri field, situated along the eastern coast of Saudi Arabia, is undergoing expansion through the Berri Increment Program (BIP) to increase its crude production capacity to 500,000 barrels per day (bpd). Initially discovered in 1964, the Berri field commenced crude oil production in 1970, with the Berri gas plant starting operations in 1977. Currently capable of producing 250,000 bpd of Arab Light crude, the field’s expansion program aims to double its crude production capacity through enhanced oil recovery techniques.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs