Search

Manifolds and Valves

Spina Group offers different types of pressure measuring instruments, including manifolds and valves suitable for static pressures, applications with liquids or for differential pressures, available for different types of installation and with different styles and designed to provide a safe and reliable method of measurement pressure and versatile towards installation within the process.

Typologies

Accessories

Among our manifolds and valves, you will find:

  • Bar stock manifolds

  • Monoflange manifolds

  • Distribution manifolds

  • Bar stock needle valves

  • Check valves

  • Ball valves

  • Compression ball valves

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Aegean Refinery Project (ARP)

The Aegean Refinery Project, officially known as the SOCAR STAR Oil Refinery, is an oil refinery located in Aliaga, Turkey. It is the largest refinery project in Europe, Middle East, and Africa (EMEA) with a processing capacity of ten million tonnes (Mt) of crude oil a year, which is equivalent to 214,000 barrels a day. STAR Refinery meets approximately 20% of Turkey’s demand for processed crude oil products and reduces the country’s petroleum products imports.

Oil&Gas

Mellitah Plant – Upgrade of Let Down Station for Local Market Gas Supply

The project aims to replace the temporary Let Down Station, installed in 2015, with permanent pressure reduction facilities at the expansion area of GS. This upgrade is intended to transport gas to the local market and supply the existing Sirte Oil Company (SOC) coastal gas pipeline with an increased capacity of 19.5 MSm3/d of sales gas at a higher pressure of 51 Bar.

Oil&Gas

Optimum Shah Gas Expansion (OSGE)

The Shah Sour Gas Plant is one of the main sour gas treatment plants in the United Arab Emirates. The project involves the expansion and integration of new facilities into the existing plant to increase the treatment capacity of the highly sour gas produced from the Shah Arab Sour Gas Field. Its objective is to increase the complex’s capacity to approximately 1.45 BSCFD, improve product recovery and contribute to the security of gas supply in the United Arab Emirates.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs