Search

Surge Arresters

Overvoltage surge arresters (also called SPD – Surge Protection Device) are mechanisms that allow to protect electrical equipment from overvoltages by absorbing the generated current. They can also be inserted in an already existing system in order not to modify the operation of the system.

Typologies

Accessories

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Zohr Field Development Project

Zohr, an offshore gas field located in the Shorouk area of Egypt, represents the largest discovery of its kind in the Mediterranean. Identified using advanced offshore exploration techniques, this massive natural gas project lies approximately two hundred kilometers north of Port Said. With vast reserves, Zohr has the potential to meet Egypt’s energy demands for many years to come. Moreover, it positions the country to become a significant player in liquefied natural gas (LNG) exports within the Mediterranean region. The project required the implementation of cutting-edge technological solutions to develop infrastructure that adhered to strict timelines, budgets, and quality standards, from the initial exploration phase to production commencement.

Oil&Gas

Mellitah Plant – Upgrade of Let Down Station for Local Market Gas Supply

The project aims to replace the temporary Let Down Station, installed in 2015, with permanent pressure reduction facilities at the expansion area of GS. This upgrade is intended to transport gas to the local market and supply the existing Sirte Oil Company (SOC) coastal gas pipeline with an increased capacity of 19.5 MSm3/d of sales gas at a higher pressure of 51 Bar.

Oil&Gas

Berri Oil Field Expansion

The Berri field, situated along the eastern coast of Saudi Arabia, is undergoing expansion through the Berri Increment Program (BIP) to increase its crude production capacity to 500,000 barrels per day (bpd). Initially discovered in 1964, the Berri field commenced crude oil production in 1970, with the Berri gas plant starting operations in 1977. Currently capable of producing 250,000 bpd of Arab Light crude, the field’s expansion program aims to double its crude production capacity through enhanced oil recovery techniques.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs