Search

Storage and Handling

Featuring durable workbenches, cabinets, and shelving systems—including cantilever models—this category supports streamlined storage and access to tools and materials. For heavy-duty handling needs, we offer advanced lifting systems, cranes, and overhead cranes, designed to ensure secure and effective movement of heavy components. Each solution is engineered to optimize productivity and maintain safety in industrial settings.

Typologies

Accessories

  • Work benches and cabinets

  • Shelving and cantilevers

  • Lifting systems and cranes

  • Overhead cranes

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Bab Far North Full Field (BFN)

The Bab Far North Full Field Development (BFN) Project is a major onshore oil field development in the United Arab Emirates. Led by ADNOC Onshore and managed by Kent PLC, the project aims to achieve a production plateau of 30,000 barrels of oil per day (bpd) by implementing CO₂ Water Alternating Gas (CO₂-WAG), an advanced enhanced oil recovery (EOR) technique that alternates the injection of carbon dioxide and water to maximize oil recovery from the reservoir.

Oil&Gas

Kaombo FPSO Project

An innovative ultra-deep-water offshore project, the Kaombo project in Block 32 aims to extract oil from six fields linked by 300km of pipelines to FPSO vessels. Operating at depths up to 1,950 meters, it utilizes advanced technology for its 658 million barrel reserves, with a production capacity of 230,000 b/d, making it Angola’s largest subsea well system. Through cutting-edge technology and engineering, it pushes the boundaries of traditional oil exploration, demonstrating Angola’s commitment to advancing its energy sector.

Oil&Gas

Garraf Field – Gas Dehydration Plant

Situated in the Thi Qar province, approximately 5km northwest of Al-Refaei city and 85km north of Nasiriya, the Garraf oil field has an onshore location. Discovered in 1984, this oil field contains oil reserves within Cretaceous reservoirs. Spanning 17.5km in length and 5.5km in width, it is estimated to harbor 1.3 billion barrels of oil. Upon reaching full production, the field’s production capacity is projected to escalate to 230,000 barrels of oil per day (bopd). Transportation of the oil field’s products is facilitated through a 13km pipeline to the Gharraf-Badra tie-in area (GBTA). Subsequently, it is conveyed via a 28-inch, 92km pipeline to the Nassiriyah storage depot.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs