Search

Storage and Handling

Featuring durable workbenches, cabinets, and shelving systems—including cantilever models—this category supports streamlined storage and access to tools and materials. For heavy-duty handling needs, we offer advanced lifting systems, cranes, and overhead cranes, designed to ensure secure and effective movement of heavy components. Each solution is engineered to optimize productivity and maintain safety in industrial settings.

Typologies

Accessories

  • Work benches and cabinets

  • Shelving and cantilevers

  • Lifting systems and cranes

  • Overhead cranes

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Tortue Development Project – Phase 1

An offshore project based on gas production in deep waters up to 2 km off the maritime border between Mauritania and Senegal. It is currently the deepest offshore project in Africa. Planned in phases, the Greater Tortue Ahmeyim LNG project will produce up to 10 million tonnes of LNG per year (Mtpa). A new drilling called Greater Tortue Ahmeyim-1 was carried out to a total depth of 4,884 meters in the eastern part of the Greater Tortue area, discovering 30 meters of net gas in a high-quality Albian reservoir in July 2019. This new discovery indicates the potential to expand the capacity of the LNG project beyond 10 Mtpa in the future.

Petrochemical

Bouri Field

The Bouri Field is located offshore in Block NC-41, about 120km northwest of Tripoli in the waters of Libya. Water depth in the region ranges between 145m and 183m. Is estimated to contain 4.5 billion barrels (720,000,000 m3) in proven recoverable crude oil reserves and 3.5 trillion cubic feet (99 km3) of associated natural gas with an annual production potential of 6 billion m³. Bouri field development includes two offshore platforms- DP3 and DP4, seven subsea wells and an Floating Storage and Offloading (FSO). Bouri is considered the largest producing oilfield in the Mediterranean.

Oil&Gas

Baltic Pipe Project – Compressor Station in Everdrup

The project aimed at the installation of piping and equipment of the Everdup Process Plant gas compression station, part of the Baltic Pipe project in Denmark. The Baltic Pipe is a strategic infrastructure project that aims to create a new gas supply corridor in the European market. Operational since October 2022, the Baltic Pipe is 900km long for a total cost of 1.88 billion dollars: it connects the Norwegian gas transport system with Denmark and Poland via an underwater gas pipeline in the North Sea.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs