Search

Storage and Handling

Featuring durable workbenches, cabinets, and shelving systems—including cantilever models—this category supports streamlined storage and access to tools and materials. For heavy-duty handling needs, we offer advanced lifting systems, cranes, and overhead cranes, designed to ensure secure and effective movement of heavy components. Each solution is engineered to optimize productivity and maintain safety in industrial settings.

Typologies

Accessories

  • Work benches and cabinets

  • Shelving and cantilevers

  • Lifting systems and cranes

  • Overhead cranes

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Bioenergy

Sannazzaro Revamping

The Sannazzaro Revamping is a project for the partial conversion of Eni’s Sannazzaro de’ Burgondi refinery, in the province of Pavia. Developed by Eni, the project involves the conversion of the Hydrocracker HDC2 unit, the construction of a pretreatment plant for waste and residues, and the upgrade of logistics and auxiliary infrastructure. The new biorefinery will have a capacity of approximately 550,000 tonnes/year and will produce HVO diesel and SAF-biojet, contributing to the decarbonization of transport and to the expansion of Eni’s biorefining capacity.

Energy

Navoi III Combined Cycle Power Plant

The project involves the construction of a new gas-fired Combined Cycle Gas Turbine — CCGT unit with a capacity of approximately 600–650 MW, developed to increase power generation capacity and improve the efficiency of the existing plant. Operated by JSC Thermal Power Plants and built with Mitsubishi Power technology, the new unit will contribute to the production of electricity and heat while reducing natural gas consumption.

Oil&Gas

Coral South Project

At the center of the project, Coral Sul FLNG: a floating plant for the liquefaction of natural gas. The ship is 432 meters long and weighs 200 thousand tons. It also has a gas liquefaction capacity of 3.4 million tons per year and will produce LNG from the 500 billion cubic meters of gas from the Coral field. This historic project will help increase the availability of gas on the global market and is an important lever of Mozambique economic and social development.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs