Search

Cable Glands

Cable glands for armored and unarmored cables, complemented by shrouds, locknuts, and serrated washers, offer secure and efficient solutions for cable management.

Typologies

Accessories

Among our cable glands, you will find:

  • Cable glands for unarmored cables

  • Cable glands for armored cables

  • Shrouds

  • Locknuts

  • Serrated washers

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Ivory Coast Baleine – FPSO Firenze

The FPSO Florence will enable the start-up of production from the Baleine field, currently the largest hydrocarbon discovery in Côte d’Ivoire, with an estimated 2.5 billion barrels of oil in place and 3.3 trillion cubic feet of associated gas. The Baleine development is also expected to become Africa’s first net-zero upstream project. Upon its arrival in Ivory Coast, the vessel will be renamed FPSO Baleine. The unit has been refurbished and upgraded to process up to 15,000 barrels of oil per day (bbl/d) and approximately 25 million standard cubic feet per day (MMscf/d) of associated gas. All produced gas will be transported onshore through a newly constructed export pipeline.

Energy

Taiba & Qassim Combined Cycle Gas Turbine (CCGT)

The Taiba & Qassim Combined Cycle Gas Turbine Projects are projects developed in Taiba and Qassim, Saudi Arabia. The programme includes the Taiba 1, Taiba 2, Qassim 1 and Qassim 2 power plants, each with a capacity of approximately 1,800 MW. The objective is to increase the Kingdom’s power generation capacity, ensure a reliable energy supply and support Saudi Arabia’s transition towards a more efficient and lower-emission electricity mix.

Oil&Gas

Hail & Ghasha Gas Development

Hail & Ghasha Gas Development is one of the world’s largest sour gas development projects. It includes the development of the offshore Hail, Ghasha, Dalma, Nasr, SARB, Bu Haseer, Shuweihat and Mubarraz fields, together with the construction of new offshore infrastructure and onshore gas processing facilities. The project is also designed to become the world’s first net-zero sour gas development. Package 2 (PKG-2) covers the construction of the onshore gas processing facilities. Its main scope includes sour gas processing plants, sulfur recovery and by-product handling units, compression systems, utilities and auxiliary infrastructure, as well as connections to the offshore installations and the UAE’s national gas network. The project aims to increase the United Arab Emirates’ natural gas production, support domestic energy self-sufficiency and boost exports, while reducing the carbon intensity of operations through the integration of Carbon Capture and Storage (CCS) technologies. Once completed, the development is expected to produce approximately 1.5–1.8 billion standard cubic feet of natural gas per day (bcf/d), in addition to condensate and sulfur, making a significant contribution to ADNOC’s long-term gas strategy.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs