Search

Tubing

Spina Group offers various types of cable holders for explosion-proof electrical systems and UL type and flexible pipes necessary for the construction of suitable “electrical conduits” inside walls and floors so that the electrical cables are protected from impact, humidity and compressions.

Typologies

Accessories

Among our tubing, you will find:

  • Stainless Steel Seamless Tubing
  • Copper Seamless Tubing

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Garraf Field – Gas Dehydration Plant

Situated in the Thi Qar province, approximately 5km northwest of Al-Refaei city and 85km north of Nasiriya, the Garraf oil field has an onshore location. Discovered in 1984, this oil field contains oil reserves within Cretaceous reservoirs. Spanning 17.5km in length and 5.5km in width, it is estimated to harbor 1.3 billion barrels of oil. Upon reaching full production, the field’s production capacity is projected to escalate to 230,000 barrels of oil per day (bopd). Transportation of the oil field’s products is facilitated through a 13km pipeline to the Gharraf-Badra tie-in area (GBTA). Subsequently, it is conveyed via a 28-inch, 92km pipeline to the Nassiriyah storage depot.

Oil&Gas

Optimum Shah Gas Expansion (OSGE)

The Shah Sour Gas Plant is one of the main sour gas treatment plants in the United Arab Emirates. The project involves the expansion and integration of new facilities into the existing plant to increase the treatment capacity of the highly sour gas produced from the Shah Arab Sour Gas Field. Its objective is to increase the complex’s capacity to approximately 1.45 BSCFD, improve product recovery and contribute to the security of gas supply in the United Arab Emirates.

Oil&Gas

Baltic Pipe Project – Compressor Station in Everdrup

The project aimed at the installation of piping and equipment of the Everdup Process Plant gas compression station, part of the Baltic Pipe project in Denmark. The Baltic Pipe is a strategic infrastructure project that aims to create a new gas supply corridor in the European market. Operational since October 2022, the Baltic Pipe is 900km long for a total cost of 1.88 billion dollars: it connects the Norwegian gas transport system with Denmark and Poland via an underwater gas pipeline in the North Sea.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs