Search

Tubing

Spina Group offers various types of cable holders for explosion-proof electrical systems and UL type and flexible pipes necessary for the construction of suitable “electrical conduits” inside walls and floors so that the electrical cables are protected from impact, humidity and compressions.

Typologies

Accessories

Among our tubing, you will find:

  • Stainless Steel Seamless Tubing
  • Copper Seamless Tubing

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Baltic Pipe Project – Compressor Station in Everdrup

The project aimed at the installation of piping and equipment of the Everdup Process Plant gas compression station, part of the Baltic Pipe project in Denmark. The Baltic Pipe is a strategic infrastructure project that aims to create a new gas supply corridor in the European market. Operational since October 2022, the Baltic Pipe is 900km long for a total cost of 1.88 billion dollars: it connects the Norwegian gas transport system with Denmark and Poland via an underwater gas pipeline in the North Sea.

Oil&Gas

Modernización Refinería Talara

The “Modernización Refinería Talara” project involves the refurbishment and modernization of the Talara refinery located in Peru. The project seeks to achieve two key objectives: reducing sulfur content in diesel, gasoline, and LPG fuels to a maximum of 50 ppm and increasing the refinery’s crude processing capacity from 65,000 to 95,000 barrels per day (BPD), allowing for the processing of heavy crude and conversion of residual products into marketable ones.

Oil&Gas

Garraf Field – Gas Dehydration Plant

Situated in the Thi Qar province, approximately 5km northwest of Al-Refaei city and 85km north of Nasiriya, the Garraf oil field has an onshore location. Discovered in 1984, this oil field contains oil reserves within Cretaceous reservoirs. Spanning 17.5km in length and 5.5km in width, it is estimated to harbor 1.3 billion barrels of oil. Upon reaching full production, the field’s production capacity is projected to escalate to 230,000 barrels of oil per day (bopd). Transportation of the oil field’s products is facilitated through a 13km pipeline to the Gharraf-Badra tie-in area (GBTA). Subsequently, it is conveyed via a 28-inch, 92km pipeline to the Nassiriyah storage depot.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs