Search

Tubing

Spina Group offers various types of cable holders for explosion-proof electrical systems and UL type and flexible pipes necessary for the construction of suitable “electrical conduits” inside walls and floors so that the electrical cables are protected from impact, humidity and compressions.

Typologies

Accessories

Among our tubing, you will find:

  • Stainless Steel Seamless Tubing
  • Copper Seamless Tubing

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Petrochemical

Project CERES

The Ceres Urea Plant, located on the coast of Western Australia, is a large onshore facility for the production of ammonia and urea from natural gas. Once completed, it will be the world’s largest gas-based ammonia and urea production plant. It uses local natural gas to produce fertilizers, integrating ammonia production, urea production, granulation, auxiliary services, port infrastructure and water supply facilities. The plant will include production areas, storage facilities and administrative functions. A 3.2 km conveyor belt will connect the plant to the port for the transport and loading of urea intended for export. The facility is designed to contribute to the target of achieving net-zero carbon emissions by 2050.

Oil&Gas

RAVEN Gases Introduction to WDGC and Amerya Plant

The RAVEN Gases Introduction to WDGC and Amerya Plant is a project in Egypt designed to connect in the Raven field, part of the West Nile Delta Gas Development, with the Western Desert Gas Complex and the El Amriya LPG Recovery Plant, operated by GASCO. The project involves the transportation of Mediterranean rich gas through a main pipeline to the WDGC and a dedicated line to the Al-Amirya plant, aiming to enhance gas supply reliability, maximize LPG and condensate recovery, and optimize the value of Egypt’s natural gas resources.

Oil&Gas

Scarabeo 5

The Scarabeo 5 is a semi-submersible offshore unit belonging to Saipem, originally designed as a 4th-generation drilling floater for exploration and production activities in harsh and subarctic environments. In 2023, Saipem was awarded a contract by Eni Congo to convert the unit into a Floating Production Unit — FPU for the Congo LNG Project. Once installed offshore the Republic of Congo, northwest of the Djeno Terminal, the unit will separate gas and liquids and compress the gas to feed a nearby FLNG unit.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs