Search

Compression Fittings

Spina Group offers a wide range of fittings, caps and reductions which ensure the absence of leaks (even in the presence of gas), good resistance to high tightening, easy assembly with the possibility of repeated assembly and disassembly.

Typologies

Accessories

Among our fittings and adapters, you will find:

  • Twin ferrules compression fittings

  • Forged and bar stock fittings

  • Instrument adapters

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

North Safa Field Development Project

North Safa is an active conventional oil field situated in shallow waters off the coast of Egypt. Specifically located in the Northeast Ramadan Concession block, the field operates at a water depth of 217 feet. Anticipated to reach peak production by 2026, North Safa’s oil extraction will persist until it reaches its economic limit in 2041, as per economic projections.

Oil&Gas

AIN TSILA GAS FIELD DEVELOPMENT

Ain Tsila is a gas condensate field situated in the Illizi Basin, Algeria, located within the Isarene permit in Blocks 228 and 229a. The Ain Tsila field boasts reserves amounting to 2.1 trillion cubic feet of sales gas, alongside 67 million barrels of condensate and 108 million barrels of liquefied petroleum gas (LPG). Discovered in 2009 through the successful drilling of the Ain Tsila-1 well, this gas condensate field garnered significant recognition, ranking as the ninth-largest discovery globally for that year. Spanning an extensive area exceeding 1,000 square kilometers, Ain Tsila represents a substantial addition to the energy landscape.

Oil&Gas

Baltic Pipe Project – Compressor Station in Everdrup

The project aimed at the installation of piping and equipment of the Everdup Process Plant gas compression station, part of the Baltic Pipe project in Denmark. The Baltic Pipe is a strategic infrastructure project that aims to create a new gas supply corridor in the European market. Operational since October 2022, the Baltic Pipe is 900km long for a total cost of 1.88 billion dollars: it connects the Norwegian gas transport system with Denmark and Poland via an underwater gas pipeline in the North Sea.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs