Search

Bare & Insulated Conductors

Tools for electrical connections, electromechanical applications, transformer rooms compliant with national and foreign regulations. Sections and shaping different from the standard can be supplied on request. The products comply with the main national and international standards and with specific customer requests.

Typologies

Accessories

Among our conductors, you will find:

  • Steel straps

  • Round conductors

  • Conductor ropes

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Coral North Project

Coral North is the second project for the development of the considerable gas resources discovered by Eni in Area 4 of the Rovuma Basin. The Floating Liquefied Natural Gas (FLNG) unit will have a capacity of around 3.5 MTPA (million tons for year). Managed by Eni and its partners, the project involves the deployment of a second Floating Liquefied Natural Gas (FLNG) facility to double the region’s LNG production, building on the success of the Coral South project.

Oil&Gas

BAPCO Modernization Program

The Bapco Modernization Programme (BMP) is on track to become one of Bahrain’s most significant projects to date. Located on Bahrain’s Eastern coast, the project aims to expand the capacity of the existing Sitra oil refinery from 267,000 to 360,000 barrels per day (BPD). Additionally, it seeks to enhance energy efficiency, maximize the utilization of heavy crude oil components, diversify product offerings, and ensure compliance with environmental standards.

Petrochemical

Project CERES

The Ceres Urea Plant, located on the coast of Western Australia, is a large onshore facility for the production of ammonia and urea from natural gas. Once completed, it will be the world’s largest gas-based ammonia and urea production plant. It uses local natural gas to produce fertilizers, integrating ammonia production, urea production, granulation, auxiliary services, port infrastructure and water supply facilities. The plant will include production areas, storage facilities and administrative functions. A 3.2 km conveyor belt will connect the plant to the port for the transport and loading of urea intended for export. The facility is designed to contribute to the target of achieving net-zero carbon emissions by 2050.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs