Search

Earthing Pits

Spina offers a wide selection of inspection sumps in anti-corrosive plastic, available with removable bottom, carriageable cover, suitable for cable and earthing connection.

Typologies

Accessories

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

CLOV Phase 3 Project

The CLOV Phase 3 Project is an offshore deepwater oil field development in Block 17, approximately 140 km off the Angolan coast. Operated by TotalEnergies, the project includes the installation of a four-well subsea production system connected to the existing CLOV floating production facility. The development is intended to increase oil output by approximately 30,000 barrels per day while maximizing the use of existing offshore infrastructure.

Oil&Gas

Coral South Project

At the center of the project, Coral Sul FLNG: a floating plant for the liquefaction of natural gas. The ship is 432 meters long and weighs 200 thousand tons. It also has a gas liquefaction capacity of 3.4 million tons per year and will produce LNG from the 500 billion cubic meters of gas from the Coral field. This historic project will help increase the availability of gas on the global market and is an important lever of Mozambique economic and social development.

Oil&Gas

New Port Harcourt Refinery (NPHR)

The New Port Harcourt Refinery — NPHR is an oil refining facility located in Alesa-Eleme, near Port Harcourt, Nigeria. Part of the Port Harcourt Refinery Complex, the plant has a nameplate capacity of approximately 150,000 bpd. The rehabilitation project is aimed at restoring the complex’s operational performance, increasing domestic fuel output and reducing Nigeria’s reliance on imported refined petroleum products.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs