Search

Gas Distribution System

  • Routing design & calculation based on
    available spaces and forecast number of
    machines
  • Consumption calculation
  • Supply of all the components including
    cylinder racks, change-overs.
  • Installation including tubing welded through
    orbital welding machines

Typologies

Accessories

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Revamp of the Fluid Catalytic Cracking Unit

The project involves upgrading the Reactor and Regenerator sections of the FCC Unit at Lukoil’s refinery in Bulgaria. This upgrade will boost the unit’s efficiency, enabling it to process more oil and produce higher-quality products. Additionally, it sets the stage for Lukoil’s future investments in the refinery, positioning the company for long-term success in the industry.

Petrochemical

Bouri Field

The Bouri Field is located offshore in Block NC-41, about 120km northwest of Tripoli in the waters of Libya. Water depth in the region ranges between 145m and 183m. Is estimated to contain 4.5 billion barrels (720,000,000 m3) in proven recoverable crude oil reserves and 3.5 trillion cubic feet (99 km3) of associated natural gas with an annual production potential of 6 billion m³. Bouri field development includes two offshore platforms- DP3 and DP4, seven subsea wells and an Floating Storage and Offloading (FSO). Bouri is considered the largest producing oilfield in the Mediterranean.

Oil&Gas

Zohr Field Development Project

Zohr, an offshore gas field located in the Shorouk area of Egypt, represents the largest discovery of its kind in the Mediterranean. Identified using advanced offshore exploration techniques, this massive natural gas project lies approximately two hundred kilometers north of Port Said. With vast reserves, Zohr has the potential to meet Egypt’s energy demands for many years to come. Moreover, it positions the country to become a significant player in liquefied natural gas (LNG) exports within the Mediterranean region. The project required the implementation of cutting-edge technological solutions to develop infrastructure that adhered to strict timelines, budgets, and quality standards, from the initial exploration phase to production commencement.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs