Petrochemical

Ras Laffan Petrochemicals Project (RLPP)

The Ras Laffan Petrochemicals Project — RLPP is an integrated petrochemical complex located in Ras Laffan Industrial City, Qatar. The project includes the development of an ethane cracker with an annual ethylene capacity of approximately 2.08 million tonnes, together with two downstream HDPE units. The project is designed to expand Qatar’s petrochemical production capacity by increasing the output of ethylene and polymer products, mainly targeting international export markets.

Energy

Navoi III Combined Cycle Power Plant

The project involves the construction of a new gas-fired Combined Cycle Gas Turbine — CCGT unit with a capacity of approximately 600–650 MW, developed to increase power generation capacity and improve the efficiency of the existing plant. Operated by JSC Thermal Power Plants and built with Mitsubishi Power technology, the new unit will contribute to the production of electricity and heat while reducing natural gas consumption.

Petrochemical

Project CERES

The Ceres Urea Plant, located on the coast of Western Australia, is a large onshore facility for the production of ammonia and urea from natural gas. Once completed, it will be the world’s largest gas-based ammonia and urea production plant. It uses local natural gas to produce fertilizers, integrating ammonia production, urea production, granulation, auxiliary services, port infrastructure and water supply facilities. The plant will include production areas, storage facilities and administrative functions. A 3.2 km conveyor belt will connect the plant to the port for the transport and loading of urea intended for export. The facility is designed to contribute to the target of achieving net-zero carbon emissions by 2050.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs