Search

Gas Distribution System

  • Routing design & calculation based on
    available spaces and forecast number of
    machines
  • Consumption calculation
  • Supply of all the components including
    cylinder racks, change-overs.
  • Installation including tubing welded through
    orbital welding machines

Typologies

Accessories

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Bioenergy

Sannazzaro Revamping

The Sannazzaro Revamping is a project for the partial conversion of Eni’s Sannazzaro de’ Burgondi refinery, in the province of Pavia. Developed by Eni, the project involves the conversion of the Hydrocracker HDC2 unit, the construction of a pretreatment plant for waste and residues, and the upgrade of logistics and auxiliary infrastructure. The new biorefinery will have a capacity of approximately 550,000 tonnes/year and will produce HVO diesel and SAF-biojet, contributing to the decarbonization of transport and to the expansion of Eni’s biorefining capacity.

Oil&Gas

Hail & Ghasha Gas Development

Hail & Ghasha Gas Development is one of the world’s largest sour gas development projects. It includes the development of the offshore Hail, Ghasha, Dalma, Nasr, SARB, Bu Haseer, Shuweihat and Mubarraz fields, together with the construction of new offshore infrastructure and onshore gas processing facilities. The project is also designed to become the world’s first net-zero sour gas development. Package 2 (PKG-2) covers the construction of the onshore gas processing facilities. Its main scope includes sour gas processing plants, sulfur recovery and by-product handling units, compression systems, utilities and auxiliary infrastructure, as well as connections to the offshore installations and the UAE’s national gas network. The project aims to increase the United Arab Emirates’ natural gas production, support domestic energy self-sufficiency and boost exports, while reducing the carbon intensity of operations through the integration of Carbon Capture and Storage (CCS) technologies. Once completed, the development is expected to produce approximately 1.5–1.8 billion standard cubic feet of natural gas per day (bcf/d), in addition to condensate and sulfur, making a significant contribution to ADNOC’s long-term gas strategy.

Oil&Gas

Norce Endeavour

The Saipem Endeavour is an offshore heavy-lift and S-lay pipelay barge, built in 2010 and operating within the Saipem fleet. Designed for operations ranging from shallow-water to deep-water environments, the vessel supports offshore projects through pipeline installation, heavy lifting, subsea installation and maintenance activities.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs