Search

Gas Distribution System

  • Routing design & calculation based on
    available spaces and forecast number of
    machines
  • Consumption calculation
  • Supply of all the components including
    cylinder racks, change-overs.
  • Installation including tubing welded through
    orbital welding machines

Typologies

Accessories

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Alba Project

Petrochemical

ALBA Project – PP and PEL plants

The project consists of two plants: one for producing linear polyethylene (PEL) and another for producing polypropylene (PP), each with an annual production capacity of 300,000 tons. Both plants utilize cutting-edge technologies that ensure top energy efficiency. These technologies are leading in the market and are the first of their kind to be implemented on the Iberian Peninsula.

Bioenergy

Rotterdam Site Development Project

The production of renewable products began at the Rotterdam refinery in the Netherlands in 2011, marking a significant milestone in sustainability efforts. With Neste’s current capacity for renewable products standing at 1.4 million tons in Rotterdam, it currently holds the title for the largest such capacity in Europe. To further bolster its commitment to renewable energy, Neste is undertaking a substantial investment of approximately EUR 1.9 billion for the expansion of the Rotterdam refinery. This expansion project aims to increase overall renewable product capacity by 1.3 million tons per annum. Consequently, the total renewable product capacity in Rotterdam will soar to 2.7 million tons annually, with sustainable aviation fuel (SAF) production capability accounting for 1.2 million tons. The target timeline for starting up the new production unit is set for 2026.

Oil&Gas

North Safa Field Development Project

North Safa is an active conventional oil field situated in shallow waters off the coast of Egypt. Specifically located in the Northeast Ramadan Concession block, the field operates at a water depth of 217 feet. Anticipated to reach peak production by 2026, North Safa’s oil extraction will persist until it reaches its economic limit in 2041, as per economic projections.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs