Search

Lighting Fixtures

Spina Group offers a wide range of lighting solutions for both indoor and outdoor environments, including LED lighting fixtures, LED floodlights, LED emergency lights, LED street lighting, and LED high and low bay lights. We provide solutions for both hazardous areas and safe areas.

Typologies

Accessories

Among our lighting fixture, you will find:

  • LED lighting fixtures

  • LED Floodlights

  • LED Emergency lights

  • LED Street lighting

  • LED high & low bay

  • accessory

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

FDS2

Saipem FDS 2 is a DP3 field development vessel designed for ultra-deepwater subsea construction. Operating primarily in J-lay mode, it is capable of installing rigid pipelines up to 36 inches in diameter, as well as subsea structures, umbilicals and flexible flowlines. Equipped with a 2,000-tonne J-lay tower, a 1,000-tonne offshore crane, a DP3 dynamic positioning system and automated welding systems, FDS 2 delivers high-precision and efficient installation for complex offshore field development projects.

Oil&Gas

Neptun Deep Project

The Neptun Deep Project is a deepwater offshore project located in the Romanian sector of the Black Sea. With OMV Petrom as operator, the project involves the development of the Domino and Pelican South gas fields through 11 offshore wells, 3 subsea infrastructure, a production platform and a pipeline to shore. Its objective is to enhance the value of the Black Sea natural gas resources, increase Romania’s domestic production and strengthen the country’s energy supply security.

Oil&Gas

Garraf Field – Gas Dehydration Plant

Situated in the Thi Qar province, approximately 5km northwest of Al-Refaei city and 85km north of Nasiriya, the Garraf oil field has an onshore location. Discovered in 1984, this oil field contains oil reserves within Cretaceous reservoirs. Spanning 17.5km in length and 5.5km in width, it is estimated to harbor 1.3 billion barrels of oil. Upon reaching full production, the field’s production capacity is projected to escalate to 230,000 barrels of oil per day (bopd). Transportation of the oil field’s products is facilitated through a 13km pipeline to the Gharraf-Badra tie-in area (GBTA). Subsequently, it is conveyed via a 28-inch, 92km pipeline to the Nassiriyah storage depot.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs