Search

Perforated and Closed-Bottom Cable Trays

Cable trays are used in the industrial plants to protect the laid cables. Specifically, the PS and AR perforated series are characterized by more lightness and by a good ventilation of the cable inside. The typology FC (closed bottom) is particularly suitable for environments where the cable isolation is essential.

Thermal expansion: Our joints with crossed slots allow an even greater deviation between the elements, recovering any possible expansion without damages.

Electrical continuity: The electrical continuity of the cable trays is guaranteed by the correct assembly of joints and/or the copper bonding jumper; for this purpose, properly marked grounding holes are made on the cable trays and cable tray accessories.

Typologies

Accessories

Among our perforated and closed-bottom cable trays, you will find:

  • Perforated simple flanges

  • Perforated bordered flanges

  • Closed bottom bordered flanges

  • Elbows (plane, inward, outward)

  • T derivations

  • Cross Elements

  • Reductions

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Mellitah Plant – Upgrade of Let Down Station for Local Market Gas Supply

The project aims to replace the temporary Let Down Station, installed in 2015, with permanent pressure reduction facilities at the expansion area of GS. This upgrade is intended to transport gas to the local market and supply the existing Sirte Oil Company (SOC) coastal gas pipeline with an increased capacity of 19.5 MSm3/d of sales gas at a higher pressure of 51 Bar.

Energy

Taweelah RO Independent Water Project

The world’s largest sea water reverse osmosis desalination plant (RO), boasting a capacity of 200 MIGD (909,200 cubic meters of water per day). This plant surpasses the world’s current largest RO facility by 44% in terms of capacity. The Taweelah plant is poised to establish new benchmarks for water production efficiency and cost, thanks to its utilization of RO technology instead of thermal desalination.

Oil&Gas

BAPCO Modernization Program

The Bapco Modernization Programme (BMP) is on track to become one of Bahrain’s most significant projects to date. Located on Bahrain’s Eastern coast, the project aims to expand the capacity of the existing Sitra oil refinery from 267,000 to 360,000 barrels per day (BPD). Additionally, it seeks to enhance energy efficiency, maximize the utilization of heavy crude oil components, diversify product offerings, and ensure compliance with environmental standards.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs