Search

Plugs and Sockets

Interlocked sockets and plugs, Switched interlocked socket outlets IP66, and Plugs IP66 are designed to deliver reliable performance in demanding environments.

Typologies

Accessories

Among our plugs and sockets, you will find:

  • Interlocked sockets and plugs

  • Switched interlocked socket outlets IP66

  • Plugs IP66

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Mozambique LNG Development

The Mozambique LNG Development is a project on the Afungi Peninsula, in northern Mozambique. Developed by the Mozambique LNG joint venture, the project involves the development of offshore gas resources in Area 1 and the construction of an onshore facility for the treatment, liquefaction, storage and export of LNG. Its objective is to enhance the value of the major natural gas reserves in the Rovuma Basin, positioning Mozambique as a key LNG exporter while generating economic and employment benefits for the country.

Oil&Gas

Talimarjan Power Project

The Talimarjan Power Project is an energy project at the Talimarjan Thermal Power Plant, in Nuristan, Uzbekistan. The project involves the expansion and upgrade of the power plant through gas-fired Combined Cycle Gas Turbine — CCGT units, with the aim of increasing the country’s power generation efficiency, reliability and capacity. Originally developed under the CAREC/ADB framework and implemented by Talimarjan TPP, the project contributes to the modernization of Uzbekistan’s power sector and to national energy security.

Petrochemical

Beaumont 3000 MTPD Synloop Ammonia Plant

The Beaumont New Ammonia Project, located in Beaumont, Texas, USA, is a major lower-carbon ammonia facility with a production capacity of 3,000 metric tonnes per day (1.1 million tonnes per year). Owned and operated by Woodside, the project is designed to expand the supply of lower-carbon ammonia for applications including power generation, marine fuels, and industrial feedstock. A key milestone was achieved in December 2025 with the successful production of first ammonia during commissioning.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs