Search

Portable Field Panels

Spina Group specializes in portable field panels designed for reliable power distribution and control for  industrial environments. These panels are made as stainless steel or GRP, ensuring durability and resistance to corrosion and impact.

Our portable field panels come with various configurations, featuring multiple input and output connections, in compliance with  IEC, CEE standard. Teh industrial panels can support different voltage levels (typically 230V to 400V). Equipped with protective enclosures rated IP55 or IP65, they provide excellent protection against dust and water ingress, making them suitable for all conditions.

These panels are ideal for applications in sectors such as oil & gas, construction, and chemical processing, enabling safe and efficient operation of portable equipment and machinery. With integrated circuit protection and compliance with relevant safety standards, Spina Group’s portable field panels ensure high performance and reliability in the field.

Typologies

Accessories

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Western desert Gas Complex Train

The expansion of Western Desert Gas Complex (WDGC) is located in El-Amreya, Alexandria, Egypt. Once operational, the new Train D will increase WDGC’s production capacity to 1.5 bcfd, up from the current 950 MMcfd, with a capacity of 600 MMcfd. This expansion will not only boost the supply of ethane-propane mixture for Egyptian petrochemical producers but also increase WDGC’s production of LPG and condensates for the local market.

Oil&Gas

Garraf Field – Gas Dehydration Plant

Situated in the Thi Qar province, approximately 5km northwest of Al-Refaei city and 85km north of Nasiriya, the Garraf oil field has an onshore location. Discovered in 1984, this oil field contains oil reserves within Cretaceous reservoirs. Spanning 17.5km in length and 5.5km in width, it is estimated to harbor 1.3 billion barrels of oil. Upon reaching full production, the field’s production capacity is projected to escalate to 230,000 barrels of oil per day (bopd). Transportation of the oil field’s products is facilitated through a 13km pipeline to the Gharraf-Badra tie-in area (GBTA). Subsequently, it is conveyed via a 28-inch, 92km pipeline to the Nassiriyah storage depot.

Energy

New Hydrogen Production Unit – Porto Marghera

The project aims at implementing two hydrogen production lines for the Venice biorefinery in Porto Marghera. Its primary objective is to increase the availability of hydrogen at the biorefinery to fulfill the requirements of the EcofiningTM unit in terms of quality, quantity, and availability, all while optimizing energy efficiency. As part of a phased transition to producing decarbonized hydrogen, these units are designed to significantly reduce the emission of fossil CO2 into the atmosphere by utilizing biogenic charges recirculated by the EcofiningTM unit.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs