Search

Pots and Siphons

Spina Group offers a wide range of condensate separation barrels, air distribution and siphons, which are used for the treatment and distribution of the process fluid before it reaches the instrument.

The siphons are used on the steam measurement lines to prevent it from directly investing the instrument and also to guarantee good heat dissipation avoiding overheating of the pressure gauge.

Typologies

Accessories

  • Condensing and Seal Pot
  • Gauge Siphon

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Abu Attifel and NC 125 Conventional Oil Field

Located onshore Libya, the Abu Attifel and NC 125 fields are active in conventional oil production. Their peak production occurred in 1994, having already recovered 92.14% of their total recoverable reserves. Economic projections indicate that oil extraction will continue until these fields reach their economic limit by 2046. Presently, these fields contribute approximately 5% to Libya’s daily oil output.

Oil&Gas

Revamp of the Fluid Catalytic Cracking Unit

The project involves upgrading the Reactor and Regenerator sections of the FCC Unit at Lukoil’s refinery in Bulgaria. This upgrade will boost the unit’s efficiency, enabling it to process more oil and produce higher-quality products. Additionally, it sets the stage for Lukoil’s future investments in the refinery, positioning the company for long-term success in the industry.

Oil&Gas

Garraf Field – Gas Dehydration Plant

Situated in the Thi Qar province, approximately 5km northwest of Al-Refaei city and 85km north of Nasiriya, the Garraf oil field has an onshore location. Discovered in 1984, this oil field contains oil reserves within Cretaceous reservoirs. Spanning 17.5km in length and 5.5km in width, it is estimated to harbor 1.3 billion barrels of oil. Upon reaching full production, the field’s production capacity is projected to escalate to 230,000 barrels of oil per day (bopd). Transportation of the oil field’s products is facilitated through a 13km pipeline to the Gharraf-Badra tie-in area (GBTA). Subsequently, it is conveyed via a 28-inch, 92km pipeline to the Nassiriyah storage depot.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs